UBC 3 office building, Timișoara

Name in the project documents: UBC 3 – Timișoara

Completed status as of August 2026SABI’s role: Structural design – PTh + DE (technical design and construction details)

3D structural analysis model of the UBC 3 building, Timișoara, with analysis results shown as a blue-to-magenta colour gradient
Analysis modelModel: SABI STRUCTURA
Glass-clad office tower at UBC 3, Timișoara, seen from a terrace with a metal pergola, climbing plants and a landscaped garden
Photolicence to be confirmed

About the project

S+P+15E office building, completed

A completed S+P+15E office building in the Iulius Town development in Timișoara. The structure has reinforced concrete coupled shear walls and perimeter frames, on a piled raft.

From model to building

3D structural analysis model of the UBC 3 building, Timișoara, with analysis results shown as a blue-to-magenta colour gradient
Glass-clad office tower at UBC 3, Timișoara, seen from a terrace with a metal pergola, climbing plants and a landscaped garden
Drag, or use the left and right arrow keys.Analysis model: SABI STRUCTURA. Photo: licence to be confirmed.

Every building we design exists first as an analysis model. Compare the model with the site and the building.

Images

  • United Business Center building in Timișoara photographed at dusk, with illuminated facades and a busy pedestrian area at its base (UBC 3)

    Photolicence to be confirmed

  • 3D structural model of the UBC 3 building, Timișoara: reinforced concrete frames (blue) and core structural walls (red)

    Analysis modelModel: SABI STRUCTURA

  • 3D model of the reinforced concrete structure of the UBC 3 building, Timișoara, with a podium base and a stepped tower

    Analysis modelModel: SABI STRUCTURA

Planning something similar?

Send us the project details and we will reply with a quote.

Similar projects

Similar projects
ProjectLocationDesign yearStoreysStatus, August 2026
Comat TowersResidential, Sun ResidenceIași2020–present2S+P+10E+1EthUnder construction
Vlaicu 87Residential, Zinan Investment GroupIași2024–2025S+P+10E+1EthUnder construction
Apart Hotel IașiHotel, Hotel OrizontIași20252S+P+12EUnder construction

S = basement, P = ground floor, M = mezzanine, E = upper floor, Eth = technical floor. Approximate areas, from the project documentation. Status as of August 2026.

Analysis model: SABI STRUCTURA. Photo: licence to be confirmed.

The names and trademarks mentioned belong to their owners and are used only to identify the projects for which SABI STRUCTURA provided structural engineering services. Mentioning them does not imply any partnership with, or endorsement by, their owners.

Tell us what you are building

The quote request takes about two minutes. We reply with a quote or, if information is missing, with the questions we need answered to prepare one.

  1. What you need
  2. About the project
  3. Your contact details

Prefer to call?

+40 742 229 328sabistructura@gmail.com

[We reply within X working days – to be confirmed]

Step 1 of 3: What you need

Service required
Type of building required

Next: about the project and your contact details.